
The initial estimate from grid operator Red Electrica was that restoring all power supply in Spain may take between six and 10 hours. By Monday evening, that was looking optimistic — at 9pm Madrid time, there was 17.3 gigawatts of demand on the grid, about two thirds the amount seen just before the blackout happened, according to grid data.